Capacity in service1.8MW1 unit · solar · incl. 1.8 MW online after 2023
Rank in California#1,297 (tied)of 1,713 · by capacity · #10,832 (tied) of 13,147 US
How big is City of Long Beach Airport Lot A & B?
1.8 MW across 1 generating unit in service.
Who owns and operates it?
Operated by Solar DG CA Long Beach, LLC, filed as independent power producer.
Which grid does it sell into?
LDWP (Los Angeles Department of Water and Power) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 2024.
When is it due to retire?
No retirement date has been filed for any operating unit at City of Long Beach Airport Lot A & B. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it run on?
Solar Photovoltaic (1.8 MW).