AMERICAN ENERGY ATLAS
Power·Louisiana

CITGO Refinery Powerhouse

Calcasieu Parish, Louisiana · MISO · operated by CITGO Petroleum Corp

2023 · headline year
Capacity in service50.0MW2 units · gas · 1 more on standby or out of service
Net generation174GWh2023 · reported
Rank in Louisiana#56 (tied)of 86 · by capacity · #3,450 (tied) of 13,147 US
Reported suppliersNot reported2023 · last deliveries 2012

Location

Calcasieu Parish · MISO · SERC

What it burns

2023 · reported

Share of reported fuel consumption

100% Refinery gas · 16.3 TBtu · reported

Reported fuel consumption, TBtu · 2011–2023

0102030201120172023
Reported (through 2023)

Generating units

3 of 3 shown · 50.0 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit GEN125.0Other gasOther Gases1942Out of service
Unit GEN225.0Other gasOther Gases1942Operating
Unit GEN325.0Other gasOther Gases1969Operating

All 3 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023. 24 deliveries are on record for 2011–2012.

Delivery history. Subscribe to see every recorded delivery, supplier, mine of origin and transport mode.

See the delivery history →

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
CITGO Petroleum Corp
Entity type
Industrial
Regulatory status
Not Regulated
Balancing authority
MISO
NERC region
SERC
Gas pipeline
Targa Midstream Services LLC
EIA plant ID
52175

Common questions

How big is CITGO Refinery Powerhouse?
50.0 MW across 2 generating units in service. A further 1 unit is listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Operated by CITGO Petroleum Corp, filed as industrial.
Which grid does it sell into?
MISO (Midcontinent Independent Transmission System Operator, Inc.) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 1956. The oldest operating unit is Unit GEN2 (1942); the newest is Unit GEN3 (1969).
When is it due to retire?
No retirement date has been filed for any operating unit at CITGO Refinery Powerhouse. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned refinery gas.

Related pages

Louisiana energyAll facilities in the state→Sterlington59.3 MW operating capacity→ St. Mary Clean Energy Center50.9 MW operating capacity→ Iris Solar LLC50.0 MW operating capacity→ LA3 West Baton Rouge Solar Facility50.0 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming