Beluga, Kenai Peninsula Borough, Alaska · operated by Chugach Electric Assn Inc · owned by Chugach Electric Assoc Inc

Standby or out of service2023 · headline year
Reported fuel cost$957,0402023 · reported deliveries
Capacity not in service312MW6 units · none in service
Net generation525MWh2023 · reported
CO₂ emitted5,820t2023 · reported to EPA · 5,871st highest of 6,030 in the US
Rank in Alaska#55of 57 · by reported CO₂ · #5,871 of 6,030 US
Reported suppliers22023 · 23 deliveries

Location

Kenai Peninsula Borough

What it burns

2023 · reported

Share of reported fuel consumption

100% Natural gas · 108,333 MMBtu · reported

CO₂ emitted, Mt · 2011–2023

00.511.5201120172023
Reported (through 2023)

Generating units

7 of 7 shown · none in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 676.5Natural GasNatural Gas Fired Combustion Turbine1976Out of service
Unit 776.5Natural GasNatural Gas Fired Combustion Turbine1978Standby
Unit 568.3Natural GasNatural Gas Fired Combustion Turbine1975Standby
Unit 359.1Natural GasNatural Gas Fired Combustion Turbine1972Standby
Unit 116.0Natural GasNatural Gas Fired Combustion Turbine1968Standby
Unit 216.0Natural GasNatural Gas Fired Combustion Turbine1968Out of service
Unit 862.0Natural GasNatural Gas Fired Combined Cycle1982Retired 2015

All 7 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years.

See the engineering record →

Who supplies the fuel

1 of 2 suppliers · delivered in 2023
SupplierFuelDelivered MMBtuTonsMine of originTransport
Hilcorp Energy CoNatural gas70,323n/an/aPipeline

Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only.

Showing 1 of 2 suppliers. Subscribe to see all 2, every one of the 309 deliveries recorded 2011–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.

See all 2 suppliers →

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
Chugach Electric Assoc Inc · 100%
Operating utility
Chugach Electric Assn Inc
Entity type
Cooperative
Regulatory status
Regulated
Industry sector
Power Plants
EPA facility ID
1005267
Gas pipeline
Alaska Pipeline Company
EIA plant ID
96

Common questions

How big is Chugach - Beluga River Power Plant?
312 MW across 6 units, none of which is in service — all on standby or out of service.
Who owns and operates it?
Owned by Chugach Electric Assoc Inc (100%) and operated by Chugach Electric Assn Inc, filed as cooperative.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas. Natural gas came from 2 suppliers in 2023.
How much does it spend on fuel?
Its fuel receipts report a delivered cost of $957,040 in 2023.
How much CO₂ does it emit?
5,820 t in 2023, reported to the EPA — the 5,871st highest of 6,030 US facilities that reported. Down from 1.3 Mt in 2011.

Related pages

Alaska energyAll facilities in the state→Capitol Disposal Landfill11,832 t CO₂ in 2023→ Hecla Greens Creek Mine9,392 t CO₂ in 2023→ MGS Platform A4,554 t CO₂ in 2023→ 7-Mile Ridge Wind ProjectPower facility→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming