Joseph City, Navajo County, Arizona · AZPS · operated by Arizona Public Service Co · owned by Pinnacle West Capital Corp
2023 · headline year
Reported fuel cost$65M2023 · reported deliveries
Capacity in service426MW2 units · coal
Net generation1.79TWh2023 · reported
CO₂ emitted2.08Mt2023 · reported to EPA · 291st highest of 6,030 in the US
Rank in Arizona#26of 166 · by capacity · #795 of 13,147 US
Reported suppliers22023 · 19 deliveries
Capacity factor48%2023
Location
What it burns
2023 · reported
Share of reported fuel consumption
100% Coal · 19 TBtu · reported
CO₂ emitted, Mt · 2011–2023
Reported (through 2023)
Generating units
4 of 4 shown · 426 MW in service
Unit
Capacity MW
Fuel
Technology
Online
Status
Unit 3
312.3
Subbituminous
Conventional Steam Coal
1980
Operating
Unit 1
113.6
Subbituminous
Conventional Steam Coal
1962
Operating
Unit 4
414.0
Subbituminous
Conventional Steam Coal
1981
Retired 2020
Unit 2
288.9
Subbituminous
Conventional Steam Coal
1978
Retired 2015
All 4 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; SO₂ scrubber type, sorbent and removal efficiency; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height; ownership stakes where a unit is jointly held.
Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only.
Showing 1 of 2 suppliers. Subscribe to see all 2, every one of the 360 deliveries recorded 2011–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.
426 MW across 2 generating units in service. A further 2 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Owned by Pinnacle West Capital Corp (100%) and operated by Arizona Public Service Co, filed as investor-owned utility.
Which grid does it sell into?
AZPS (Arizona Public Service Company) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 1975. The oldest operating unit is Unit 1 (1962); the newest is Unit 3 (1980).
When is it due to retire?
Planned retirement dates are filed for 2 of 2 operating units: Unit 1 (2025) and Unit 3 (2025).
What does it burn, and where does the fuel come from?
In 2023 it burned coal. Coal delivered in 2023 came from 1 coal supplier, from mines in New Mexico — principally El Segundo. Other fuels (natural gas) came from 1 supplier in 2023.
How much does it spend on fuel?
Its fuel receipts report a delivered cost of $65M in 2023.
How much CO₂ does it emit?
2.08 Mt in 2023, reported to the EPA — the 291st highest of 6,030 US facilities that reported. Down from 7.87 Mt in 2011.