Beaufort County, North Carolina · CPLE · operated by Choco Solar LLC
| Unit | Capacity MW | Fuel | Technology | Online | Status |
|---|---|---|---|---|---|
| Unit CHOCO | 5.0 | Solar | Solar Photovoltaic | 2014 | Operating |
| Unit TGCCW | 5.0 | Solar | Solar Photovoltaic | 2027 | Proposed |
All 2 units shown. Behind each one, AEA holds the full engineering record: panel technology, tracking and DC capacity.
See the engineering record →| Unit | Event | When | MW |
|---|---|---|---|
| Unit CHOCO | retirement | 2026-12 | 5.0 MW |
| Unit TGCCW | new unit | 2027 | 5.0 MW |