Fuel spend$02023 · no purchased fuel
Capacity in service38.0MW2 units · storage + solar · incl. 19.0 MW online after 2023
Rank in Arizona#83of 166 · by capacity · #3,834 (tied) of 13,147 US
All 2 units shown. Behind each one, AEA holds the full engineering record: panel technology, tracking and DC capacity; energy capacity in MWh, charge and discharge rates and use cases.
See the engineering record →
How big is Chino Valley Solar?
38.0 MW across 2 generating units in service — 19.0 MW of storage and 19.0 MW of solar.
Who owns and operates it?
Operated by Arizona Public Service Co, filed as investor-owned utility.
Which grid does it sell into?
AZPS (Arizona Public Service Company) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 2018. The oldest operating unit is Unit PV1 (2012); the newest is Unit CV19M (2024).
When is it due to retire?
No retirement date has been filed for any operating unit at Chino Valley Solar. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it run on?
Batteries (19.0 MW) and Solar Photovoltaic (19.0 MW).
How much does it spend on fuel?
Nothing in 2023 — its units in service (batteries and solar photovoltaic) burn no fuel, and it reports no fuel consumption to the EIA.