Livingston County, Missouri · SPP · operated by Chillicothe Municipal Utils
Oil & petroleum supplies 70% of the fuel energy it burned in 2023. Per unit of heat, oil & petroleum costs Chillicothe an estimated 7.8× more than natural gas — and oil & petroleum is 5 of its 7 operating units and 11% of operating capacity.
| Unit | Capacity MW | Fuel | Technology | Online | Status |
|---|---|---|---|---|---|
| Unit GT1 | 40.0 | Natural Gas | Natural Gas Fired Combustion Turbine | 1986 | Operating |
| Unit GT2 | 40.0 | Natural Gas | Natural Gas Fired Combustion Turbine | 1986 | Operating |
| Unit D1 | 2.0 | Distillate oil | Petroleum Liquids | 2003 | Operating |
| Unit D2 | 2.0 | Distillate oil | Petroleum Liquids | 2003 | Operating |
| Unit D3 | 2.0 | Distillate oil | Petroleum Liquids | 2003 | Operating |
| Unit D4 | 2.0 | Distillate oil | Petroleum Liquids | 2003 | Operating |
| Unit D5 | 2.0 | Distillate oil | Petroleum Liquids | 2003 | Operating |
| Unit 6 | 6.0 | Bituminous coal | Conventional Steam Coal | 1958 | Retired 2004 |
| Unit 5 | 5.0 | Bituminous coal | Conventional Steam Coal | 1948 | Retired 2004 |
| Unit 4A | 2.5 | Bituminous coal | Conventional Steam Coal | 1938 | Retired 2004 |
All 10 units shown. Behind each one, AEA holds the full engineering record: co-firing fuels and fuel-switching times.
See the engineering record →Delivery history. Subscribe to see every recorded delivery, supplier, mine of origin and transport mode.
See the delivery history →