AMERICAN ENERGY ATLAS
Power·California

Childrens Hospital

San Diego County, California · CAISO · operated by DTE San Diego COGEN Inc.

2023 · headline year
Fuel spend$5.78M2023 · estimate
Capacity in service4.8MW1 unit · gas · 4 more on standby or out of service
Net generation26.7GWh2023 · reported
Rank in California#930 (tied)of 1,713 · by capacity · #7,658 (tied) of 13,147 US
Reported suppliersNot reported2023

Location

San Diego County · CAISO · WECC

What it burns

2023 · reported

Share of reported fuel consumption

100% Natural gas · 424,345 MMBtu · reported · $5.78M est.

Reported fuel consumption, MMBtu · 2011–2023

0200,000400,000600,000201120172023
Reported (through 2023)

Generating units

9 of 9 shown · 4.8 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 17114.8Natural GasNatural Gas Fired Combustion Turbine2004Operating
Unit 07992.0Distillate oilPetroleum Liquids2000Standby
Unit 50831.5Distillate oilPetroleum Liquids2010Standby
Unit 50841.5Distillate oilPetroleum Liquids2010Standby
Unit 50851.5Distillate oilPetroleum Liquids2010Standby
Unit 16310.6Natural GasNatural Gas Internal Combustion Engine1993Retired 2003
Unit 16980.3Natural GasNatural Gas Internal Combustion Engine1983Retired 2004
Unit 16990.3Natural GasNatural Gas Internal Combustion Engine1983Retired 2003
Unit 17100.3Natural GasNatural Gas Internal Combustion Engine1983Retired 2004

All 9 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.

See the engineering record →
UnitEventWhenMW
Unit 0799retirement2027-012.0 MW

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
DTE San Diego COGEN Inc.
Entity type
Commercial
Regulatory status
Not Regulated
Balancing authority
CAISO
NERC region
WECC
EIA plant ID
10175

Common questions

How big is Childrens Hospital?
4.8 MW across 1 generating unit in service. A further 8 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Operated by DTE San Diego COGEN Inc., filed as commercial.
Which grid does it sell into?
CAISO (California Independent System Operator) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 2004.
When is it due to retire?
No retirement date has been filed for any operating unit at Childrens Hospital. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas.
How much does it spend on fuel?
An estimated $5.78M in 2023 — natural gas $5.78M and oil & petroleum $5,073. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.

Related pages

California energyAll facilities in the state→Lake Mathews4.9 MW operating capacity→ Ocsd4.9 MW operating capacity→ Equinix Caspian Dr. Fuel Cell4.8 MW operating capacity→ Igs Oxr14.8 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming