El Segundo, Los Angeles County, California · CAISO · operated by Chevron USA Inc-El Segundo · owned by Chevron Corp
2023 · headline year
The 3rd-largest reported CO₂ emitter among facilities in California — 3.25 Mt in 2023, first unit online in 1987, newest in 2013.
Fuel spend$232M2023 · estimate
Capacity in service180MW6 units · gas
Net generation1.15TWh2023 · reported
CO₂ emitted3.25Mt2023 · reported to EPA · 142nd highest of 6,030 in the US
Rank in California#131of 1,713 · by capacity · #1,616 of 13,147 US
Reported suppliersNot reported2023 · last deliveries 2011
Capacity factor73%2023
Location
What its on-site power plant burns
2023 · reported
Share of reported fuel consumption
97% Natural gas · 13.8 TBtu · reported · $232M est.3% Refinery gas · 0.454 TBtu · reported
Natural gas supplies 97% of the fuel energy its on-site power plant burned in 2023.
CO₂ emitted, Mt · 2011–2023
Reported (through 2023)
Generating units
8 of 8 shown · 180 MW in service
Unit
Capacity MW
Fuel
Technology
Online
Status
Unit GEN1
42.4
Natural Gas
Natural Gas Fired Combined Cycle
1987
Operating
Unit GEN2
42.4
Natural Gas
Natural Gas Fired Combined Cycle
1987
Operating
Unit GEN7
40.7
Natural Gas
Natural Gas Fired Combined Cycle
2013
Operating
Unit GEN5
40.3
Natural Gas
Natural Gas Fired Combined Cycle
1996
Operating
Unit GEN6
9.1
Natural Gas
Natural Gas Fired Combined Cycle
1996
Operating
Unit GEN8
5.2
Natural Gas
Natural Gas Fired Combined Cycle
2013
Operating
Unit GEN3
1.5
Natural Gas
Natural Gas Fired Combined Cycle
1975
Retired 1986
Unit GEN4
1.2
Natural Gas
Natural Gas Fired Combined Cycle
1991
Retired 1996
All 8 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years; ownership stakes where a unit is jointly held.
180 MW across 6 generating units in service. A further 2 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Owned by Chevron Corp (100%) and operated by Chevron USA Inc-El Segundo, filed as industrial.
Which grid does it sell into?
CAISO (California Independent System Operator) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 1996. The oldest operating units are Unit GEN1 and Unit GEN2 (1987); the newest are Unit GEN7 and Unit GEN8 (2013).
When is it due to retire?
No retirement date has been filed for any operating unit at Chevron Products, El Segundo Refinery. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 its on-site power plant burned natural gas and refinery gas.
How much does it spend on fuel?
An estimated $232M in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
3.25 Mt in 2023, reported to the EPA — the 142nd highest of 6,030 US facilities that reported. Up from 3.19 Mt in 2011.