AMERICAN ENERGY ATLAS
Power·Virginia

Chesterfield Power Station

Chester, Chesterfield County, Virginia · PJM · operated by Virginia Electric & Power Co · owned by Dominion Energy Inc

2023 · headline year
Reported fuel cost$55.2M2023 · reported deliveries
Capacity in service447MW4 units · gas
Net generation2.43TWh2023 · reported
CO₂ emitted1.29Mt2023 · reported to EPA · 470th highest of 6,030 in the US
Rank in Virginia#20of 230 · by capacity · #776 of 13,147 US
Reported suppliers32023 · 13 deliveries
Capacity factor62%2023

Location

Chesterfield County · PJM · SERC

What it burns

2023 · reported

Share of reported fuel consumption

77% Natural gas · 15.2 TBtu · reported22% Coal · 4.38 TBtu · reported

Natural gas supplies 77% of the fuel energy it burned in 2023.

CO₂ emitted, Mt · 2011–2023

0369201120172023
Reported (through 2023)

Generating units

8 of 8 shown · 447 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit CT8148.0Natural GasNatural Gas Fired Combined Cycle1992Operating
Unit CT7145.0Natural GasNatural Gas Fired Combined Cycle1990Operating
Unit CW879.2Natural GasNatural Gas Fired Combined Cycle1992Operating
Unit CW774.4Natural GasNatural Gas Fired Combined Cycle1990Operating
Unit 6693.9Bituminous coalConventional Steam Coal1969Retired 2023
Unit 5359.0Bituminous coalConventional Steam Coal1964Retired 2023
Unit 4187.5Bituminous coalConventional Steam Coal1960Retired 2019
Unit 3112.5Bituminous coalConventional Steam Coal1952Retired 2019

All 8 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; co-firing fuels and fuel-switching times; SO₂ scrubber type, sorbent and removal efficiency; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height.

See the engineering record →

Who supplies the fuel

1 of 3 suppliers · delivered in 2023
SupplierFuelDelivered TBtuTonsMine of originTransport
Virginia Power Services EnergyNatural gas15.3n/an/aPipeline

Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only. Deliveries and consumption are reported separately and need not match in a year (stockpiles, and pipeline gas that fuel receipts do not capture).

Showing 1 of 3 suppliers. Subscribe to see all 3, every one of the 1,191 deliveries recorded 2011–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.

See all 3 suppliers →

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
Dominion Energy Inc · 100%
Operating utility
Virginia Electric & Power Co
Entity type
Investor-Owned Utility
Regulatory status
Regulated
Industry sector
Power Plants
EPA facility ID
1000964
Balancing authority
PJM
NERC region
SERC
Gas pipeline
Dominion Transmission Incorporated
EIA plant ID
3797

Common questions

How big is Chesterfield Power Station?
447 MW across 4 generating units in service. A further 4 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Owned by Dominion Energy Inc (100%) and operated by Virginia Electric & Power Co, filed as investor-owned utility.
Which grid does it sell into?
PJM (PJM Interconnection, LLC) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 1991. The oldest operating units are Unit CT7 and Unit CW7 (1990); the newest are Unit CT8 and Unit CW8 (1992).
When is it due to retire?
No retirement date has been filed for any operating unit at Chesterfield Power Station. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas and coal. Coal delivered in 2023 came from 1 coal supplier, from mines in West Virginia — principally Loveridge #22. Other fuels (natural gas) came from 2 suppliers in 2023.
How much does it spend on fuel?
Its fuel receipts report a delivered cost of $55.2M in 2023.
How much CO₂ does it emit?
1.29 Mt in 2023, reported to the EPA — the 470th highest of 6,030 US facilities that reported. Down from 6.14 Mt in 2011.

Related pages

Virginia energyAll facilities in the state→Louisa Generation Facility546 MW operating capacity→ Clinch River475 MW operating capacity→ Commonwealth Chesapeake402 MW operating capacity→ Hopewell Energy Facility399 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming