Fuel spend$3.75M2023 · estimate
Capacity in service118MW2 units · gas
Net generation116GWh2023 · reported
CO₂ emitted50,857t2023 · reported to EPA · 3,661st highest of 6,030 in the US
Rank in South Carolina#28of 204 · by capacity · #2,165 of 13,147 US
Reported suppliersNot reported2023 · last deliveries 2011
Capacity factor11%2023
All 2 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years.
See the engineering record →
How big is Cherokee County Cogen?
118 MW across 2 generating units in service.
Who owns and operates it?
Which grid does it sell into?
SC (South Carolina Public Service Authority) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 1998. Every operating unit came online in 1998.
When is it due to retire?
No retirement date has been filed for any operating unit at Cherokee County Cogen. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas.
How much does it spend on fuel?
An estimated $3.75M in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
50,857 t in 2023, reported to the EPA — the 3,661st highest of 6,030 US facilities that reported. Down from 230,867 t in 2011.