Chehalis Generation Facility

Chehalis, Lewis County, Washington · BPAT · operated by PacifiCorp · owned by Berkshire Hathaway Inc

2023 · headline year
Reported fuel cost$159M2023 · reported deliveries
Capacity in service593MW3 units · gas
Net generation2.24TWh2023 · reported
CO₂ emitted914,726t2023 · reported to EPA · 637th highest of 6,030 in the US
Rank in Washington#13of 128 · by capacity · #594 (tied) of 13,147 US
Reported suppliers12023 · 12 deliveries
Capacity factor43%2023

Location

Lewis County · BPAT · WECC

What it burns

2023 · reported

Share of reported fuel consumption

100% Natural gas · 16.8 TBtu · reported

CO₂ emitted, Mt · 2011–2023

00.511.5201120172023
Reported (through 2023)

Generating units

3 of 3 shown · 593 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit CT1198.9Natural GasNatural Gas Fired Combined Cycle2003Operating
Unit CT2198.9Natural GasNatural Gas Fired Combined Cycle2003Operating
Unit CA195.5Natural GasNatural Gas Fired Combined Cycle2003Operating

All 3 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate.

See the engineering record →
UnitEventWhenMW
Unit CAretirement2043-12196 MW
Unit CT1retirement2043-12199 MW
Unit CT2retirement2043-12199 MW

Who supplies the fuel

1 of 1 supplier · delivered in 2023
SupplierFuelDelivered TBtuTonsMine of originTransport
Northwest PipelineNatural gas16.8n/an/aPipeline

Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only.

The supplier is shown. Subscribe to see every one of the 152 deliveries recorded 2011–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.

See the delivery history →

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
Berkshire Hathaway Inc · 100%
Operating utility
PacifiCorp
Entity type
Investor-Owned Utility
Regulatory status
Regulated
Industry sector
Power Plants
EPA facility ID
1000144
Balancing authority
BPAT
NERC region
WECC
Gas pipeline
Northwest Pipeline GP
EIA plant ID
55662

Common questions

How big is Chehalis Generation Facility?
593 MW across 3 generating units in service.
Who owns and operates it?
Owned by Berkshire Hathaway Inc (100%) and operated by PacifiCorp, filed as investor-owned utility.
Which grid does it sell into?
BPAT (Bonneville Power Administration) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 2003. Every operating unit came online in 2003.
When is it due to retire?
Planned retirement dates are filed for 3 of 3 operating units: Unit CA (2043), Unit CT1 (2043) and Unit CT2 (2043).
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas. Natural gas came from 1 supplier in 2023.
How much does it spend on fuel?
Its fuel receipts report a delivered cost of $159M in 2023.
How much CO₂ does it emit?
914,726 t in 2023, reported to the EPA — the 637th highest of 6,030 US facilities that reported. Up from 280,952 t in 2011.

Related pages

Washington energyAll facilities in the state→Grays Harbor Energy Center715 MW operating capacity→ Lower Monumental675 MW operating capacity→ Little Goose540 MW operating capacity→ Rock Island514 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming