AMERICAN ENERGY ATLAS
Power·Georgia

Chattahoochee Energy Facility

Franklin, Heard County, Georgia · SOCO · operated by Oglethorpe Power Corporation · owned by Oglethorpe Power Corp

2023 · headline year
Reported fuel cost$59.1M2023 · reported deliveries
Capacity in service540MW3 units · gas
Net generation3.53TWh2023 · reported
CO₂ emitted1.31Mt2023 · reported to EPA · 464th highest of 6,030 in the US
Rank in Georgia#22of 247 · by capacity · #661 of 13,147 US
Reported suppliers552023 · 435 deliveries
Capacity factor75%2023

Location

Heard County · SOCO · SERC

What it burns

2023 · reported

Share of reported fuel consumption

100% Natural gas · 24.3 TBtu · reported

CO₂ emitted, Mt · 2011–2023

00.511.5201120172023
Reported (through 2023)

Generating units

3 of 3 shown · 540 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 3187.7Natural GasNatural Gas Fired Combined Cycle2003Operating
Unit 1176.0Natural GasNatural Gas Fired Combined Cycle2003Operating
Unit 2176.0Natural GasNatural Gas Fired Combined Cycle2003Operating

All 3 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height.

See the engineering record →

Who supplies the fuel

1 of 55 suppliers · delivered in 2023
SupplierFuelDelivered TBtuTonsMine of originTransport
Pacific SummitNatural gas3.69n/an/aPipeline

Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only.

Showing 1 of 55 suppliers. Subscribe to see all 55, every one of the 1,892 deliveries recorded 2011–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.

See all 55 suppliers →

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
Oglethorpe Power Corp · 100%
Operating utility
Oglethorpe Power Corporation
Entity type
Cooperative
Regulatory status
Regulated
Industry sector
Power Plants
EPA facility ID
1001178
Balancing authority
SOCO
NERC region
SERC
Gas pipeline
Transcontinental Gas Pipeline
EIA plant ID
7917

Common questions

How big is Chattahoochee Energy Facility?
540 MW across 3 generating units in service.
Who owns and operates it?
Owned by Oglethorpe Power Corp (100%) and operated by Oglethorpe Power Corporation, filed as cooperative.
Which grid does it sell into?
SOCO (Southern Company Services, Inc. - Trans) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 2003. Every operating unit came online in 2003.
When is it due to retire?
No retirement date has been filed for any operating unit at Chattahoochee Energy Facility. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas. Natural gas came from 55 suppliers in 2023.
How much does it spend on fuel?
Its fuel receipts report a delivered cost of $59.1M in 2023.
How much CO₂ does it emit?
1.31 Mt in 2023, reported to the EPA — the 464th highest of 6,030 US facilities that reported. Up from 736,598 t in 2011.

Related pages

Georgia energyAll facilities in the state→Sewell Creek Energy570 MW operating capacity→ McManus560 MW operating capacity→ Carters500 MW operating capacity→ Hawk Road Energy Facility495 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming