AMERICAN ENERGY ATLAS
Power·New York

Charles P Keller

Nassau County, New York · NYISO · operated by Village of Rockville Centre - (NY)

2023 · headline year
Fuel spend$13,9992023 · estimate
Capacity in service29.4MW6 units · gas
Net generation24MWh2023 · reported
Rank in New York#126of 1,018 · by capacity · #4,080 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor0%2023

Location

Nassau County · NYISO · NPCC

What it burns

2023 · reported

Share of reported fuel consumption

90% Natural gas · 2,559 MMBtu · reported · $7,866 est.10% Oil & petroleum · 278 MMBtu · reported · $6,133 est.

Natural gas supplies 90% of the fuel energy it burned in 2023.

Reported fuel consumption, MMBtu · 2011–2023

020,00040,00060,000201120172023
Reported (through 2023)

Generating units

8 of 8 shown · 29.4 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 146.2Natural GasNatural Gas Internal Combustion Engine1994Operating
Unit 125.5Natural GasNatural Gas Internal Combustion Engine1967Operating
Unit 135.5Natural GasNatural Gas Internal Combustion Engine1974Operating
Unit 115.2Natural GasNatural Gas Internal Combustion Engine1962Operating
Unit 103.5Natural GasNatural Gas Internal Combustion Engine1954Operating
Unit 93.5Natural GasNatural Gas Internal Combustion Engine1954Operating
Unit 82.4Distillate oilPetroleum Liquids1950Retired 2017
Unit 72.0Distillate oilPetroleum Liquids1942Retired 2018

All 8 units shown. Behind each one, AEA holds the full engineering record: co-firing fuels and fuel-switching times.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
Village of Rockville Centre - (NY)
Entity type
Municipally Owned Utility
Regulatory status
Regulated
Balancing authority
NYISO
NERC region
NPCC
EIA plant ID
2695

Common questions

How big is Charles P Keller?
29.4 MW across 6 generating units in service. A further 2 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Operated by Village of Rockville Centre - (NY), filed as municipally owned utility.
Which grid does it sell into?
NYISO (New York Independent System Operator) is its balancing authority, inside NERC's NPCC region.
How old is it?
The capacity-weighted average megawatt here came online in 1970. The oldest operating units are Unit 10 and Unit 9 (1954); the newest is Unit 14 (1994).
When is it due to retire?
No retirement date has been filed for any operating unit at Charles P Keller. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas and oil & petroleum.
How much does it spend on fuel?
An estimated $13,999 in 2023 — natural gas $7,866 and oil & petroleum $6,133. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.

Related pages

New York energyAll facilities in the state→Colton30.0 MW operating capacity→ Fenner Wind30.0 MW operating capacity→ Finch Paper LLC29.0 MW operating capacity→ Reworld Huntington28.0 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming