AMERICAN ENERGY ATLAS
Power·Florida

Charles Larsen Memorial Power Plant

Lakeland, Polk County, Florida · FMPP · operated by City of Lakeland - (FL) · owned by City of Lakeland Florida

2023 · headline year
Fuel spend$9.85M2023 · estimate
Capacity in service111MW2 units · gas · 2 more on standby or out of service
Net generation238GWh2023 · reported
CO₂ emitted122,460t2023 · reported to EPA · 2,105th highest of 6,030 in the US
Rank in Florida#64of 310 · by capacity · #2,214 (tied) of 13,147 US
Reported suppliersNot reported2023 · last deliveries 2011

Location

Polk County · FMPP · SERC

What it burns

2023 · reported

Share of reported fuel consumption

100% Natural gas · 2.46 TBtu · reported · $9.83M est.

CO₂ emitted, t · 2011–2023

050,000100,000150,000201120172023
Reported (through 2023)

Generating units

5 of 5 shown · 111 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 886.2Natural GasNatural Gas Fired Combined Cycle1992Operating
Unit 525.0Natural GasNatural Gas Fired Combined Cycle1956Operating
Unit 211.2Natural GasNatural Gas Fired Combustion Turbine1962Out of service
Unit 311.2Natural GasNatural Gas Fired Combustion Turbine1962Out of service
Unit 625.0Natural GasNatural Gas Steam Turbine1959Retired 2003

All 5 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; co-firing fuels and fuel-switching times; NOₓ, particulate and mercury controls with compliance years.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023. 24 deliveries are on record for 2011.

Delivery history. Subscribe to see every recorded delivery, supplier, mine of origin and transport mode.

See the delivery history →

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
City of Lakeland Florida · 100%
Operating utility
City of Lakeland - (FL)
Entity type
Municipally Owned Utility
Regulatory status
Regulated
Industry sector
Power Plants
EPA facility ID
1001499
Balancing authority
FMPP
NERC region
SERC
Gas pipeline
Florida Gas Transmission Company, Gulfstream Natural Gas System LLC
EIA plant ID
675

Common questions

How big is Charles Larsen Memorial Power Plant?
111 MW across 2 generating units in service. A further 3 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Owned by City of Lakeland Florida (100%) and operated by City of Lakeland - (FL), filed as municipally owned utility.
Which grid does it sell into?
FMPP (Florida Municipal Power Pool) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 1984. The oldest operating unit is Unit 5 (1956); the newest is Unit 8 (1992).
When is it due to retire?
No retirement date has been filed for any operating unit at Charles Larsen Memorial Power Plant. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas.
How much does it spend on fuel?
An estimated $9.85M in 2023 — natural gas $9.83M and oil & petroleum $17,960. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
122,460 t in 2023, reported to the EPA — the 2,105th highest of 6,030 US facilities that reported. Up from 28,852 t in 2011.

Related pages

Florida energyAll facilities in the state→Orlando CoGen122 MW operating capacity→ Deerhaven Renewable116 MW operating capacity→ Echo River Solar104 MW operating capacity→ Sunshine Gateway Solar Energy Center104 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming