Aquasco, Prince George'S County, Maryland · PJM · operated by Chalk Point Power, LLC · owned by Genon Energy Inc
2023 · headline year
The 2nd-largest power plant in Maryland by capacity — 1,825 MW, 100% natural gas by fuel energy in 2023, first unit online in 1967, newest in 1991.
Fuel spend$33M2023 · estimate
Capacity in service1,825MW8 units · gas + oil
Net generation691GWh2023 · reported
CO₂ emitted471,263t2023 · reported to EPA · 968th highest of 6,030 in the US
Rank in Maryland#2of 210 · by capacity · #94 of 13,147 US
Reported suppliers32023 · 14 deliveries
Capacity factor4%2023
Location
What it burns
2023 · reported
Share of reported fuel consumption
100% Natural gas · 8.09 TBtu · reported · $32.3M est.
CO₂ emitted, Mt · 2011–2023
Reported (through 2023)
Generating units
8 of 8 shown · 1,825 MW in service
Unit
Capacity MW
Fuel
Technology
Online
Status
Unit 3
659.0
Natural Gas
Natural Gas Steam Turbine
1975
Operating
Unit 4
659.0
Natural Gas
Natural Gas Steam Turbine
1981
Operating
Unit GT5
125.0
Natural Gas
Natural Gas Fired Combustion Turbine
1991
Operating
Unit GT6
125.0
Natural Gas
Natural Gas Fired Combustion Turbine
1991
Operating
Unit GT3
103.0
Natural Gas
Natural Gas Fired Combustion Turbine
1991
Operating
Unit GT4
103.0
Natural Gas
Natural Gas Fired Combustion Turbine
1991
Operating
Unit GT2
35.0
Distillate oil
Petroleum Liquids
1974
Operating
Unit GT1
16.0
Distillate oil
Petroleum Liquids
1967
Operating
All 8 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; co-firing fuels and fuel-switching times; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height.
Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only. Deliveries and consumption are reported separately and need not match in a year (stockpiles, and pipeline gas that fuel receipts do not capture).
Showing 1 of 3 suppliers. Subscribe to see all 3, every one of the 484 deliveries recorded 2011–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.
1,825 MW across 8 generating units in service — 1,774 MW of natural gas and 51.0 MW of oil.
Who owns and operates it?
Owned by Genon Energy Inc (100%) and operated by Chalk Point Power, LLC, filed as independent power producer.
Which grid does it sell into?
PJM (PJM Interconnection, LLC) is its balancing authority, inside NERC's ReliabilityFirst region.
How old is it?
The capacity-weighted average megawatt here came online in 1981. The oldest operating unit is Unit GT1 (1967); the newest are Unit GT5, Unit GT6, Unit GT3 and Unit GT4 (1991).
When is it due to retire?
No retirement date has been filed for any operating unit at Chalk Point. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas. Natural gas and oil & petroleum came from 3 suppliers in 2023.
How much does it spend on fuel?
An estimated $33M in 2023 — natural gas $32.3M and oil & petroleum $674,268. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
471,263 t in 2023, reported to the EPA — the 968th highest of 6,030 US facilities that reported. Down from 4.04 Mt in 2011.