AMERICAN ENERGY ATLAS
Power·Washington

Centralia

Centralia, Lewis County, Washington · BPAT · operated by TransAlta Centralia Gen LLC · owned by Transalta USA Inc

2023 · headline year

The largest reported CO₂ emitter among facilities in Washington — 4.54 Mt in 2023, 100% coal by fuel energy in 2023, first unit online in 1973.

Fuel spend$125M2023 · estimate
Capacity in service730MW1 unit · coal
Net generation4.14TWh2023 · reported
CO₂ emitted4.54Mt2023 · reported to EPA · 83rd highest of 6,030 in the US
Rank in Washington#10of 128 · by capacity · #452 of 13,147 US
Reported suppliers32023 · 32 deliveries
Capacity factor65%2023

Location

Lewis County · BPAT · WECC

What it burns

2023 · reported

Share of reported fuel consumption

100% Coal · 48.1 TBtu · reported · $124M est.

CO₂ emitted, Mt · 2011–2023

0369201120172023
Reported (through 2023)

Generating units

7 of 7 shown · 730 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 2729.9SubbituminousConventional Steam Coal1973Operating
Unit 1729.9Refined coalConventional Steam Coal1972Retired 2020
Unit 7080.0Natural GasNatural Gas Fired Combined Cycle2002Retired 2013
Unit 3060.5Natural GasNatural Gas Fired Combined Cycle2002Retired 2013
Unit 4060.5Natural GasNatural Gas Fired Combined Cycle2002Retired 2013
Unit 5060.5Natural GasNatural Gas Fired Combined Cycle2002Retired 2013
Unit 6060.5Natural GasNatural Gas Fired Combined Cycle2002Retired 2013

All 7 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; SO₂ scrubber type, sorbent and removal efficiency; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height.

See the engineering record →
UnitEventWhenMW
Unit 2retirement2025-12730 MW

Who supplies the fuel

1 of 3 suppliers · delivered in 2023
SupplierFuelDelivered TBtuTonsMine of originTransport
Navajo Transitional EnergyCoal28.21,579,675Spring Creek Coal Company, Montana + 1 moreRail

Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only.

Showing 1 of 3 suppliers. Subscribe to see all 3, every one of the 485 deliveries recorded 2011–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.

See all 3 suppliers →

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
Transalta USA Inc · 100%
Operating utility
TransAlta Centralia Gen LLC
Entity type
Independent Power Producer
Regulatory status
Not Regulated
Industry sector
Power Plants
EPA facility ID
1007310
Balancing authority
BPAT
NERC region
WECC
EIA plant ID
3845

Common questions

How big is Centralia?
730 MW across 1 generating unit in service. A further 6 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Owned by Transalta USA Inc (100%) and operated by TransAlta Centralia Gen LLC, filed as independent power producer.
Which grid does it sell into?
BPAT (Bonneville Power Administration) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 1973.
When is it due to retire?
Planned retirement dates are filed for 1 of 1 operating units: Unit 2 (2025).
What does it burn, and where does the fuel come from?
In 2023 it burned coal. Coal delivered in 2023 came from 2 coal suppliers, from mines in Montana and Wyoming — principally Spring Creek Coal Company. Other fuels (oil & petroleum) came from 1 supplier in 2023.
How much does it spend on fuel?
An estimated $125M in 2023 — coal $124M and oil & petroleum $1.29M. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
4.54 Mt in 2023, reported to the EPA — the 83rd highest of 6,030 US facilities that reported. Down from 5.63 Mt in 2011.

Related pages

Washington energyAll facilities in the state→Lower Granite810 MW operating capacity→ Wells778 MW operating capacity→ Grays Harbor Energy Center715 MW operating capacity→ Lower Monumental675 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming