Fuel spend$24,6072023 · estimate
Capacity in service4.0MW3 units · biomass
Net generation17.7GWh2023 · reported
CO₂ emitted39,900t2023 · reported to EPA · 4,141st highest of 6,030 in the US
Rank in Michigan#188 (tied)of 258 · by capacity · #8,041 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor51%2023
How big is Central Sanitary Landfill?
4.0 MW across 3 generating units in service.
Who owns and operates it?
Owned by
Republic Services Inc (100%) and operated by North American Central - LLC, filed as independent power producer.
Which grid does it sell into?
MISO (Midcontinent Independent Transmission System Operator, Inc.) is its balancing authority, inside NERC's ReliabilityFirst region.
How old is it?
The capacity-weighted average megawatt here came online in 2019. The oldest operating units are Unit 1 and Unit 2 (2018); the newest is Unit 3 (2020).
When is it due to retire?
No retirement date has been filed for any operating unit at Central Sanitary Landfill. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 its on-site power plant burned landfill gas.
How much does it spend on fuel?
An estimated $24,607 in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
39,900 t in 2023, reported to the EPA — the 4,141st highest of 6,030 US facilities that reported. Down from 44,920 t in 2011.