AMERICAN ENERGY ATLAS
Industrial + power·Iowa

Central Disposal Systems Inc

Lake Mills, Winnebago County, Iowa · MISO · operated by WM Renewable Energy LLC · owned by Waste Management Inc

2023 · headline year
Fuel spend$29,9072023 · estimate
Capacity in service4.0MW5 units · biomass
Net generation19.2GWh2023 · reported
CO₂ emitted44,514t2023 · reported to EPA · 3,913th highest of 6,030 in the US
Rank in Iowa#171 (tied)of 256 · by capacity · #8,041 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor55%2023

Location

Winnebago County · MISO · MRO

What it burns

2023 · reported

Share of reported fuel consumption

100% Landfill gas · 229,802 MMBtu · reported

CO₂ emitted, t · 2011–2023

025,00050,00075,000201120172023
Reported (through 2023)

Generating units

6 of 6 shown · 4.0 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit GEN10.8Landfill gasLandfill Gas2006Operating
Unit GEN20.8Landfill gasLandfill Gas2006Operating
Unit GEN30.8Landfill gasLandfill Gas2006Operating
Unit GEN40.8Landfill gasLandfill Gas2006Operating
Unit GEN50.8Landfill gasLandfill Gas2006Operating
Unit GEN60.8Landfill gasLandfill Gas2006Retired 2017

All 6 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
Waste Management Inc · 100%
Operating utility
WM Renewable Energy LLC
Entity type
Industrial
Regulatory status
Not Regulated
Industry sector
Waste
EPA facility ID
1007673
Balancing authority
MISO
NERC region
MRO
EIA plant ID
56521

Common questions

How big is Central Disposal Systems Inc?
4.0 MW across 5 generating units in service. A further 1 unit is listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Owned by Waste Management Inc (100%) and operated by WM Renewable Energy LLC, filed as industrial.
Which grid does it sell into?
MISO (Midcontinent Independent Transmission System Operator, Inc.) is its balancing authority, inside NERC's MRO region.
How old is it?
The capacity-weighted average megawatt here came online in 2006. Every operating unit came online in 2006.
When is it due to retire?
No retirement date has been filed for any operating unit at Central Disposal Systems Inc. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned landfill gas.
How much does it spend on fuel?
An estimated $29,907 in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
44,514 t in 2023, reported to the EPA — the 3,913th highest of 6,030 US facilities that reported. Down from 61,155 t in 2011.

Related pages

Iowa energyAll facilities in the state→Hopkinton4.1 MW operating capacity→ POET Biorefining - Hanlontown LLC4.0 MW operating capacity→ Lake Park4.0 MW operating capacity→ Neal Energy Center Solar4.0 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming