AMERICAN ENERGY ATLAS
Power·Illinois

Carmi

White County, Illinois · MISO · operated by City of Carmi - (IL)

2023 · headline year
Fuel spend$10,6912023 · estimate
Capacity in service13.4MW7 units · oil
Net generation47MWh2023 · reported
Rank in Illinois#144 (tied)of 433 · by capacity · #5,057 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor0%2023

Location

White County · MISO · SERC

What it burns

2023 · reported

Share of reported fuel consumption

100% Oil & petroleum · 507 MMBtu · reported · $10,691 est.

Reported fuel consumption, MMBtu · 2011–2023

01,0002,0003,000201120172023
Reported (through 2023)

Generating units

10 of 10 shown · 13.4 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 134.4Distillate oilPetroleum Liquids1973Operating
Unit 122.0Distillate oilPetroleum Liquids1967Operating
Unit 101.7Distillate oilPetroleum Liquids1958Operating
Unit 91.7Distillate oilPetroleum Liquids1958Operating
Unit 81.4Distillate oilPetroleum Liquids1951Operating
Unit 141.1Distillate oilPetroleum Liquids2013Operating
Unit 71.1Distillate oilPetroleum Liquids1948Operating
Unit 112.7Distillate oilPetroleum Liquids1963Retired 2019
Unit 60.7Distillate oilPetroleum Liquids1939Retired 2014
Unit 50.6Natural GasNatural Gas Internal Combustion Engine1945Retired 2013

All 10 units shown. Behind each one, AEA holds the full engineering record: co-firing fuels and fuel-switching times.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
City of Carmi - (IL)
Entity type
Municipally Owned Utility
Regulatory status
Regulated
Balancing authority
MISO
NERC region
SERC
EIA plant ID
937

Common questions

How big is Carmi?
13.4 MW across 7 generating units in service. A further 3 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Operated by City of Carmi - (IL), filed as municipally owned utility.
Which grid does it sell into?
MISO (Midcontinent Independent Transmission System Operator, Inc.) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 1967. The oldest operating unit is Unit 7 (1948); the newest is Unit 14 (2013).
When is it due to retire?
No retirement date has been filed for any operating unit at Carmi. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned oil & petroleum.
How much does it spend on fuel?
An estimated $10,691 in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.

Related pages

Illinois energyAll facilities in the state→Rantoul14.4 MW operating capacity→ City of Peru Plank Road Generating Station13.5 MW operating capacity→ Industrial Park13.4 MW operating capacity→ ENERGY SYSTEMS GROUP, LLC- North Chicago Energy Center12.4 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming