Beaver County, Utah · LDWP · operated by Cape HoldCo LLC
Capacity shown is planned or not in service
A planned 159 MW geothermal project, filed to come online in 2026.
| Unit | Capacity MW | Fuel | Technology | Online | Status |
|---|---|---|---|---|---|
| Unit CP1G1 | 53.0 | Geothermal | Geothermal | 2026 | Proposed |
| Unit CP1G2 | 53.0 | Geothermal | Geothermal | 2027 | Proposed |
| Unit CP1G3 | 53.0 | Geothermal | Geothermal | 2027 | Proposed |
All 3 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.
See the engineering record →| Unit | Event | When | MW |
|---|---|---|---|
| Unit CP1G1 | new unit | 2026 | 53.0 MW |
| Unit CP1G2 | new unit | 2027 | 53.0 MW |
| Unit CP1G3 | new unit | 2027 | 53.0 MW |