AMERICAN ENERGY ATLAS
Power·California

Canyon Power Plant

Anaheim, CA, Orange County, California · CAISO · operated by City of Anaheim - (CA) · owned by Southern California Public Power Authority

2023 · headline year
Reported fuel cost$6.38M2023 · reported deliveries
Capacity in service150MW3 units · gas · 1 more on standby or out of service
Net generation103GWh2023 · reported
CO₂ emitted58,327t2023 · reported to EPA · 3,409th highest of 6,030 in the US
Rank in California#163 (tied)of 1,713 · by capacity · #1,817 (tied) of 13,147 US
Reported suppliers12023 · 12 deliveries

Location

Orange County · CAISO · WECC

What it burns

2023 · reported

Share of reported fuel consumption

100% Natural gas · 1.05 TBtu · reported

CO₂ emitted, t · 2011–2023

050,000100,000150,000201120172023
Reported (through 2023)

Generating units

4 of 4 shown · 150 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit CPP150.0Natural GasNatural Gas Fired Combustion Turbine2011Out of service
Unit CPP250.0Natural GasNatural Gas Fired Combustion Turbine2011Operating
Unit CPP350.0Natural GasNatural Gas Fired Combustion Turbine2011Operating
Unit CPP450.0Natural GasNatural Gas Fired Combustion Turbine2011Operating

All 4 units shown. Behind each one, AEA holds the full engineering record: ownership stakes where a unit is jointly held.

See the engineering record →

Who supplies the fuel

1 of 1 supplier · delivered in 2023
SupplierFuelDelivered TBtuTonsMine of originTransport
Coral EnergyNatural gas1.05n/an/aPipeline

Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only.

The supplier is shown. Subscribe to see every one of the 149 deliveries recorded 2011–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.

See the delivery history →

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
City of Anaheim - (CA)
Entity type
Municipally Owned Utility
Regulatory status
Regulated
Industry sector
Power Plants
EPA facility ID
1000566
Balancing authority
CAISO
NERC region
WECC
EIA plant ID
57027

Common questions

How big is Canyon Power Plant?
150 MW across 3 generating units in service. A further 1 unit is listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Owned by Southern California Public Power Authority (100%) and operated by City of Anaheim - (CA), filed as municipally owned utility.
Which grid does it sell into?
CAISO (California Independent System Operator) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 2011. Every operating unit came online in 2011.
When is it due to retire?
No retirement date has been filed for any operating unit at Canyon Power Plant. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas. Natural gas came from 1 supplier in 2023.
How much does it spend on fuel?
Its fuel receipts report a delivered cost of $6.38M in 2023.
How much CO₂ does it emit?
58,327 t in 2023, reported to the EPA — the 3,409th highest of 6,030 US facilities that reported. Up from 21,314 t in 2011.

Related pages

California energyAll facilities in the state→Pacific Wind LLC152 MW operating capacity→ North Rosamond Solar LLC151 MW operating capacity→ Alta Wind Energy Center I150 MW operating capacity→ Alta Wind Energy Center II150 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming