Arapahoe County, Colorado · WACM · operated by Canyon Peak Power, LLC
Capacity shown is planned or not in service
A planned 157 MW natural gas fired combustion turbine project, filed to come online in 2026.
| Unit | Capacity MW | Fuel | Technology | Online | Status |
|---|---|---|---|---|---|
| Unit CPP_1 | 26.1 | Natural Gas | Natural Gas Fired Combustion Turbine | 2026 | Proposed |
| Unit CPP_2 | 26.1 | Natural Gas | Natural Gas Fired Combustion Turbine | 2026 | Proposed |
| Unit CPP_3 | 26.1 | Natural Gas | Natural Gas Fired Combustion Turbine | 2026 | Proposed |
| Unit CPP_4 | 26.1 | Natural Gas | Natural Gas Fired Combustion Turbine | 2026 | Proposed |
| Unit CPP_5 | 26.1 | Natural Gas | Natural Gas Fired Combustion Turbine | 2026 | Proposed |
| Unit CPP_6 | 26.1 | Natural Gas | Natural Gas Fired Combustion Turbine | 2026 | Proposed |
All 6 units shown. Behind each one, AEA holds the full engineering record: ownership stakes where a unit is jointly held.
See the engineering record →| Unit | Event | When | MW |
|---|---|---|---|
| Unit CPP_1 | new unit | 2026 | 26.1 MW |
| Unit CPP_2 | new unit | 2026 | 26.1 MW |
| Unit CPP_3 | new unit | 2026 | 26.1 MW |
| Unit CPP_4 | new unit | 2026 | 26.1 MW |
| Unit CPP_5 | new unit | 2026 | 26.1 MW |
| Unit CPP_6 | new unit | 2026 | 26.1 MW |