Fuel spend$1.08M2023 · estimate
Capacity in service109MW1 unit · gas
Net generation23.5GWh2023 · reported
CO₂ emitted17,018t2023 · reported to EPA · 5,539th highest of 6,030 in the US
Rank in Nebraska#27of 127 · by capacity · #2,244 (tied) of 13,147 US
Reported suppliersNot reported2023 · last deliveries 2012
Capacity factor2%2023
1 unit shown. Behind it, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height.
See the engineering record →
How big is Canaday?
109 MW across 1 generating unit in service.
Who owns and operates it?
Which grid does it sell into?
SPP (Southwest Power Pool) is its balancing authority, inside NERC's MRO region.
How old is it?
The capacity-weighted average megawatt here came online in 1958.
When is it due to retire?
No retirement date has been filed for any operating unit at Canaday. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas.
How much does it spend on fuel?
An estimated $1.08M in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
17,018 t in 2023, reported to the EPA — the 5,539th highest of 6,030 US facilities that reported. Up from 3,178 t in 2011.