Power·California
Camino Solar Hybrid
Kern County, California · CAISO · operated by Avangrid Power LLC
Capacity shown is planned or not in service
Proposed
A planned 44.0 MW solar photovoltaic project, filed to come online in 2025.
Planned capacity44.0MW1 unit · not yet in service
Location
Generating units
2 of 2 shown · none in service
All 2 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.
See the engineering record →
Ownership & operations
- Operating utility
- Avangrid Power LLC
- Entity type
- Independent Power Producer
- Regulatory status
- Not Regulated
- Balancing authority
- CAISO
- NERC region
- WECC
- EIA plant ID
- 63508
Common questions
How big is Camino Solar Hybrid?
44.0 MW across 1 unit, none of which is in service — the rest planned.
Who owns and operates it?
Operated by Avangrid Power LLC, filed as independent power producer.
Which grid does it sell into?
CAISO (California Independent System Operator) is its balancing authority, inside NERC's WECC region.
What does it run on?
Solar Photovoltaic (44.0 MW).
Related pages
Select a state