Calabasas Sanitary Landfill

Agoura (unincorp. La County), Los Angeles County, California · CAISO · operated by Los Angeles County Sanitation · owned by County of Los Angeles California

2023 · headline year
Fuel spend$7.09M2023 · estimate
Capacity in service9.2MW2 units · biomass
Net generation47.4GWh2023 · reported
CO₂ emitted48,172t2023 · reported to EPA · 3,776th highest of 6,030 in the US
Rank in California#775 (tied)of 1,713 · by capacity · #5,725 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor59%2023

Location

Los Angeles County · CAISO · WECC

What it burns

2023 · reported

Share of reported fuel consumption

100% Landfill gas · 437,252 MMBtu · reported

CO₂ emitted, t · 2011–2023

0100,000200,000300,000201120172023
Reported (through 2023)

Generating units

3 of 3 shown · 9.2 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit GEN14.6Landfill gasLandfill Gas2010Operating
Unit GEN34.6Landfill gasLandfill Gas2010Operating
Unit GEN24.6Landfill gasLandfill Gas2010Retired 2018

All 3 units shown. Behind each one, AEA holds the full engineering record: co-firing fuels and fuel-switching times.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
County of Los Angeles California · 100%
Operating utility
Los Angeles County Sanitation
Entity type
Political Subdivision
Regulatory status
Not Regulated
Industry sector
Waste
EPA facility ID
1003599
Balancing authority
CAISO
NERC region
WECC
EIA plant ID
57163

Common questions

How big is Calabasas Sanitary Landfill?
9.2 MW across 2 generating units in service. A further 1 unit is listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Owned by County of Los Angeles California (100%) and operated by Los Angeles County Sanitation, filed as political subdivision.
Which grid does it sell into?
CAISO (California Independent System Operator) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 2010. Every operating unit came online in 2010.
When is it due to retire?
No retirement date has been filed for any operating unit at Calabasas Sanitary Landfill. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned landfill gas.
How much does it spend on fuel?
An estimated $7.09M in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
48,172 t in 2023, reported to the EPA — the 3,776th highest of 6,030 US facilities that reported. Down from 103,426 t in 2011.

Related pages

California energyAll facilities in the state→San Dimas9.9 MW operating capacity→ Solar Star California, XLIV, LLC9.5 MW operating capacity→ Ameresco Chiquita Canyon9.2 MW operating capacity→ Central Utilities Plant LAX 29.2 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming