Yaphank, Suffolk County, New York · NYISO · operated by Caithness Long Island, LLC · owned by Caithness Long Island LLC
2023 · headline year
Fuel spend$56.1M2023 · estimate
Capacity in service349MW2 units · gas
Net generation2.46TWh2023 · reported
CO₂ emitted898,317t2023 · reported to EPA · 645th highest of 6,030 in the US
Rank in New York#30of 1,018 · by capacity · #896 of 13,147 US
Reported suppliers22023 · 25 deliveries
Capacity factor81%2023
Location
What it burns
2023 · reported
Share of reported fuel consumption
100% Natural gas · 18.2 TBtu · reported · $56M est.
CO₂ emitted, t · 2011–2023
Reported (through 2023)
Generating units
2 of 2 shown · 349 MW in service
Unit
Capacity MW
Fuel
Technology
Online
Status
Unit CT01
196.2
Natural Gas
Natural Gas Fired Combined Cycle
2009
Operating
Unit ST01
152.7
Natural Gas
Natural Gas Fired Combined Cycle
2009
Operating
All 2 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; co-firing fuels and fuel-switching times; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height.
Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only. Deliveries and consumption are reported separately and need not match in a year (stockpiles, and pipeline gas that fuel receipts do not capture).
Showing 1 of 2 suppliers. Subscribe to see all 2, every one of the 313 deliveries recorded 2011–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.
Owned by Caithness Long Island LLC (100%) and operated by Caithness Long Island, LLC, filed as independent power producer.
Which grid does it sell into?
NYISO (New York Independent System Operator) is its balancing authority, inside NERC's NPCC region.
How old is it?
The capacity-weighted average megawatt here came online in 2009. Every operating unit came online in 2009.
When is it due to retire?
No retirement date has been filed for any operating unit at Caithness Long Island Energy Center. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas. Natural gas and oil & petroleum came from 2 suppliers in 2023.
How much does it spend on fuel?
An estimated $56.1M in 2023 — natural gas $56M and oil & petroleum $9,994. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
898,317 t in 2023, reported to the EPA — the 645th highest of 6,030 US facilities that reported. Up from 846,184 t in 2011.