Cabot Holyoke

Hampden County, Massachusetts · ISO-NE · operated by City of Holyoke Gas and Electric Dept.

2023 · headline year
Fuel spend$02023 · no purchased fuel
Capacity in service2.6MW4 units · hydro
Rank in Massachusetts#349 (tied)of 666 · by capacity · #9,287 (tied) of 13,147 US
Reported suppliersNot reported2023

Location

Hampden County · ISO-NE · NPCC

Generating units

7 of 7 shown · 2.6 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 10.8WaterConventional Hydroelectric1893Operating
Unit 20.8WaterConventional Hydroelectric1938Operating
Unit 40.6WaterConventional Hydroelectric1907Operating
Unit 30.4WaterConventional Hydroelectric1939Operating
Unit 610.0Natural GasNatural Gas Steam Turbine1955Retired 2013
Unit 810.0Natural GasNatural Gas Steam Turbine1951Retired 2013
Unit 96.0Natural GasNatural Gas Steam Turbine1941Retired 2009

All 7 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
City of Holyoke Gas and Electric Dept.
Entity type
Municipally Owned Utility
Regulatory status
Regulated
Balancing authority
ISO-NE
NERC region
NPCC
EIA plant ID
9864

Common questions

How big is Cabot Holyoke?
2.6 MW across 4 generating units in service. A further 3 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Operated by City of Holyoke Gas and Electric Dept., filed as municipally owned utility.
Which grid does it sell into?
ISO-NE (ISO New England Inc.) is its balancing authority, inside NERC's NPCC region.
How old is it?
The capacity-weighted average megawatt here came online in 1917. The oldest operating unit is Unit 1 (1893); the newest is Unit 3 (1939).
When is it due to retire?
No retirement date has been filed for any operating unit at Cabot Holyoke. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
Its generating units are fuelled by natural gas.
How much does it spend on fuel?
Nothing in 2023 — its units in service (conventional hydroelectric) burn no fuel, and it reports no fuel consumption to the EIA.

Related pages

Massachusetts energyAll facilities in the state→Rounseville Solar2.7 MW operating capacity→ Braley Road 22.6 MW operating capacity→ Dudley Landfill Solar LLC2.6 MW operating capacity→ Mendon2.6 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming