CA-Ventura County CCD-Ventura College

Ventura County, California · CAISO · operated by Forefront Power, LLC

Capacity shown is planned or not in service

Proposed

A planned 2.5 MW solar photovoltaic project, filed to come online in 2025.

Planned capacity2.5MW1 unit · not yet in service

Location

Ventura County · CAISO · WECC

Generating units

1 of 1 shown · none in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 170242.5SolarSolar Photovoltaic2025Proposed

1 unit shown. Behind it, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.

See the engineering record →
UnitEventWhenMW
Unit 17024new unit20252.5 MW

Ownership & operations

Operating utility
Forefront Power, LLC
Entity type
Independent Power Producer
Regulatory status
Not Regulated
Balancing authority
CAISO
NERC region
WECC
EIA plant ID
65527

Common questions

How big is CA-Ventura County CCD-Ventura College?
2.5 MW across 1 unit, none of which is in service — all planned.
Who owns and operates it?
Operated by Forefront Power, LLC, filed as independent power producer.
Which grid does it sell into?
CAISO (California Independent System Operator) is its balancing authority, inside NERC's WECC region.
What does it run on?
Solar Photovoltaic (2.5 MW).

Related pages

California energyAll facilities in the state→CA OXNARD 2600 Sakioka DrPower facility→ CA Riverside 2356 Fleetwood Dr.Power facility→ CaballeroPower facility→ Cabrillo Power I Encina Power StationPower facility→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming