Power·California
CA Moss Landing 3040 Hilltop Rd
Monterey County, California · CAISO · operated by Catalyze Moss Landing Hilltop Rd Microgrid, LLC
Capacity shown is planned or not in service
Proposed
A planned 2.2 MW solar photovoltaic project, filed to come online in 2026.
Planned capacity2.2MW2 units · not yet in service
Location
Generating units
2 of 2 shown · none in service
All 2 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.
See the engineering record →
Ownership & operations
- Operating utility
- Catalyze Moss Landing Hilltop Rd Microgrid, LLC
- Entity type
- Independent Power Producer
- Regulatory status
- Not Regulated
- Balancing authority
- CAISO
- NERC region
- WECC
- EIA plant ID
- 66510
Common questions
How big is CA Moss Landing 3040 Hilltop Rd?
2.2 MW across 2 units, none of which is in service — all planned.
Who owns and operates it?
Operated by Catalyze Moss Landing Hilltop Rd Microgrid, LLC, filed as independent power producer.
Which grid does it sell into?
CAISO (California Independent System Operator) is its balancing authority, inside NERC's WECC region.
What does it run on?
Solar Photovoltaic (1.2 MW) and Batteries (1.0 MW).
Related pages
Select a state