Capacity in service3.0MW2 units · solar + storage · incl. 3.0 MW online after 2023
Rank in California#1,051 (tied)of 1,713 · by capacity · #8,746 (tied) of 13,147 US
All 2 units shown. Behind each one, AEA holds the full engineering record: panel technology, tracking and DC capacity; energy capacity in MWh, charge and discharge rates and use cases.
See the engineering record →
How big is CA Manteca 730 Spreckels Ave?
3.0 MW across 2 generating units in service — 1.5 MW of solar and 1.5 MW of storage.
Who owns and operates it?
Operated by Catalyze Manteca 730 Spreckels Avenue Microgrid LLC, filed as independent power producer.
Which grid does it sell into?
CAISO (California Independent System Operator) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 2024. Every operating unit came online in 2024.
When is it due to retire?
No retirement date has been filed for any operating unit at CA Manteca 730 Spreckels Ave. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it run on?
Solar Photovoltaic (1.5 MW) and Batteries (1.5 MW).