Natural gas supplies 63% of the fuel energy it burned in 2023.
CO₂ emitted, t · 2011–14
Reported (through 2014)
Generating units
6 of 6 shown · 143 MW in service
Unit
Capacity MW
Fuel
Technology
Online
Status
Unit GT2
63.4
Natural Gas
Natural Gas Fired Combustion Turbine
2003
Operating
Unit GT3
63.4
Natural Gas
Natural Gas Fired Combustion Turbine
2003
Operating
Unit GT1
16.0
Natural Gas
Natural Gas Fired Combustion Turbine
1968
Operating
Unit 3
54.4
Natural Gas
Natural Gas Steam Turbine
1972
Retired 2017
Unit 2
24.9
Natural Gas
Natural Gas Steam Turbine
1963
Retired 2016
Unit 1
18.7
Natural Gas
Natural Gas Steam Turbine
1957
Retired 2016
All 6 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; co-firing fuels and fuel-switching times; NOₓ, particulate and mercury controls with compliance years.
143 MW across 3 generating units in service. A further 3 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Operated by City of Grand Island - (NE), filed as municipally owned utility.
Which grid does it sell into?
SPP (Southwest Power Pool) is its balancing authority, inside NERC's MRO region.
How old is it?
The capacity-weighted average megawatt here came online in 1999. The oldest operating unit is Unit GT1 (1968); the newest are Unit GT2 and Unit GT3 (2003).
When is it due to retire?
No retirement date has been filed for any operating unit at C W Burdick. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas and oil & petroleum.