Lakeland, Polk County, Florida · FMPP · operated by City of Lakeland - (FL) · owned by City of Lakeland Florida
| Unit | Capacity MW | Fuel | Technology | Online | Status |
|---|---|---|---|---|---|
| Unit 5CT | 249.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2001 | Operating |
| Unit 5ST | 135.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2002 | Operating |
| Unit GT2 | 130.0 | Natural Gas | Natural Gas Fired Combustion Turbine | 2020 | Operating |
| Unit GT1 | 26.6 | Natural Gas | Natural Gas Fired Combustion Turbine | 1973 | Operating |
| Unit IC6 | 20.3 | Natural Gas | Natural Gas Internal Combustion Engine | 2024 | Operating |
| Unit IC7 | 20.3 | Natural Gas | Natural Gas Internal Combustion Engine | 2024 | Operating |
| Unit IC8 | 20.3 | Natural Gas | Natural Gas Internal Combustion Engine | 2024 | Operating |
| Unit IC1 | 2.5 | Distillate oil | Petroleum Liquids | 1970 | Operating |
| Unit IC2 | 2.5 | Distillate oil | Petroleum Liquids | 1970 | Operating |
| Unit IC3 | 20.3 | Natural Gas | Natural Gas Internal Combustion Engine | 2025 | Proposed |
| Unit IC4 | 20.3 | Natural Gas | Natural Gas Internal Combustion Engine | 2025 | Proposed |
| Unit IC5 | 20.3 | Natural Gas | Natural Gas Internal Combustion Engine | 2025 | Proposed |
| Unit 3 | 363.8 | Bituminous coal | Conventional Steam Coal | 1982 | Retired 2021 |
| Unit ST2 | 126.0 | Natural Gas | Natural Gas Steam Turbine | 1976 | Retired 2020 |
| Unit ST1 | 103.5 | Natural Gas | Natural Gas Steam Turbine | 1971 | Retired 2015 |
| Unit 4 | 288.0 | Petroleum coke | Petroleum Coke | not reported | Canceled |
| Unit PV6 | 16.0 | Solar | Solar Photovoltaic | not reported | Canceled |
All 17 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; co-firing fuels and fuel-switching times; SO₂ scrubber type, sorbent and removal efficiency; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height; ownership stakes where a unit is jointly held.
See the engineering record →| Unit | Event | When | MW |
|---|---|---|---|
| Unit IC3 | new unit | 2025 | 20.3 MW |
| Unit IC4 | new unit | 2025 | 20.3 MW |
| Unit IC5 | new unit | 2025 | 20.3 MW |
| Supplier | Fuel | Delivered TBtu | Tons | Mine of origin | Transport |
|---|---|---|---|---|---|
| Gulf Stream | Natural gas | 5.92 | n/a | n/a | Pipeline |
Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only.
Showing 1 of 3 suppliers. Subscribe to see all 3, every one of the 492 deliveries recorded 2011–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.
See all 3 suppliers →