Bull Run

Clinton, Anderson County, Tennessee · TVA · operated by Tennessee Valley Authority · owned by US Government

Generating units retired 20232023 · headline year

Retired — its last generating unit went out of service in 2023, ending 950 MW of capacity, 98% coal by fuel energy in 2023.

Fuel spend$30.6M2023 · estimate
Retired capacity950MW1 unit · none in service
CO₂ emitted830,801t2023 · reported to EPA · 690th highest of 6,030 in the US
Rank in Tennessee#9of 109 · by reported CO₂ · #690 of 6,030 US

Location

Anderson County · TVA · SERC

What it burns

2023 · reported

Share of reported fuel consumption

98% Coal · 8.35 TBtu · reported · $27.5M est.2% Oil & petroleum · 0.17 TBtu · reported · $3.12M est.

Coal supplies 98% of the fuel energy it burned in 2023.

CO₂ emitted, Mt · 2011–2023

0123201120172023
Reported (through 2023)

Generating units

1 of 1 shown · none in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 1950.0Bituminous coalConventional Steam Coal1967Retired 2023

1 unit shown. Behind it, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; SO₂ scrubber type, sorbent and removal efficiency; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height.

See the engineering record →

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
US Government
Operating utility
Tennessee Valley Authority
Entity type
Federally Owned Utility
Regulatory status
Regulated
Industry sector
Power Plants
EPA facility ID
1000917
Balancing authority
TVA
NERC region
SERC
EIA plant ID
3396

Common questions

How big is Bull Run?
950 MW across 1 unit, none of which is in service — all retired.
Who owns and operates it?
Owned by US Government and operated by Tennessee Valley Authority, filed as federally owned utility.
Which grid does it sell into?
TVA (Tennessee Valley Authority) is its balancing authority, inside NERC's SERC region.
When is it due to retire?
It has already retired — the last unit retired in 2023.
What does it burn, and where does the fuel come from?
In 2023 it burned coal and oil & petroleum.
How much does it spend on fuel?
An estimated $30.6M in 2023 — coal $27.5M and oil & petroleum $3.12M. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
830,801 t in 2023, reported to the EPA — the 690th highest of 6,030 US facilities that reported. Down from 2.48 Mt in 2011.

Related pages

Tennessee energyAll facilities in the state→SR Jackson II1.0 MW operating capacity→ Valero Refining Co. (prev. Premcor Refining, Prev. Williams Refining LLC)1.2 Mt CO₂ in 2023→ Signal Mountain Cement Co814,743 t CO₂ in 2023→ Cemex Construction Materials Atlantic LLC441,463 t CO₂ in 2023→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming