Fuel spend$25,6402023 · estimate
Capacity in service5.0MW5 units · gas + solar + storage · incl. 1.2 MW online after 2023
Rank in Maryland#58 (tied)of 210 · by capacity · #6,619 (tied) of 13,147 US
Reported suppliersNot reported2023
All 5 units shown. Behind each one, AEA holds the full engineering record: panel technology, tracking and DC capacity; energy capacity in MWh, charge and discharge rates and use cases; ownership stakes where a unit is jointly held.
See the engineering record →
How big is Brookville Smart Bus Depot Microgrid?
5.0 MW across 5 generating units in service — 1.8 MW of natural gas, 1.7 MW of solar and 1.5 MW of storage.
Who owns and operates it?
Operated by AlphaStruxure Service Co LP, filed as independent power producer.
Which grid does it sell into?
PJM (PJM Interconnection, LLC) is its balancing authority, inside NERC's ReliabilityFirst region.
How old is it?
The capacity-weighted average megawatt here came online in 2023. The oldest operating units are Unit PV and Unit BESS (2022); the newest are Unit GEN2 and Unit GEN3 (2024).
When is it due to retire?
No retirement date has been filed for any operating unit at Brookville Smart Bus Depot Microgrid. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas.
How much does it spend on fuel?
An estimated $25,640 in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.