AMERICAN ENERGY ATLAS
Power·Virginia

Bristol Plant

Bristol City, Virginia · TVA · operated by Ingenco Renewable Development, LLC

Retired 20242023 · headline year

Retired — its last generating unit went out of service in 2024, ending 5.4 MW of capacity, 93% landfill gas by fuel energy in 2023.

Retired capacity5.4MW18 units · none in service
Reported suppliersNot reported2023

Location

Bristol City · TVA · RFC

What it burns

2023 · reported

Share of reported fuel consumption

93% Landfill gas · 27,539 MMBtu · reported7% Oil & petroleum · 2,009 MMBtu · reported

Landfill gas supplies 93% of the fuel energy it burned in 2023.

Reported fuel consumption, MMBtu · 2015–23

050,000100,000150,000201520192023
Reported (through 2023)

Generating units

18 of 18 shown · none in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit A10.3Landfill gasLandfill Gas2016Retired 2024
Unit A20.3Landfill gasLandfill Gas2016Retired 2024
Unit A30.3Landfill gasLandfill Gas2016Retired 2024
Unit A40.3Landfill gasLandfill Gas2016Retired 2024
Unit A50.3Landfill gasLandfill Gas2016Retired 2024
Unit A60.3Landfill gasLandfill Gas2016Retired 2024
Unit B10.3Landfill gasLandfill Gas2016Retired 2019
Unit B20.3Landfill gasLandfill Gas2016Retired 2019
Unit B30.3Landfill gasLandfill Gas2016Retired 2019
Unit B40.3Landfill gasLandfill Gas2016Retired 2019
Unit B50.3Landfill gasLandfill Gas2016Retired 2019
Unit B60.3Landfill gasLandfill Gas2016Retired 2019
Unit C10.3Landfill gasLandfill Gas2015Retired 2024
Unit C20.3Landfill gasLandfill Gas2015Retired 2024
Unit C30.3Landfill gasLandfill Gas2015Retired 2024
Unit C40.3Landfill gasLandfill Gas2015Retired 2024
Unit C50.3Landfill gasLandfill Gas2015Retired 2024
Unit C60.3Landfill gasLandfill Gas2015Retired 2024

All 18 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
Ingenco Renewable Development, LLC
Entity type
Independent Power Producer
Regulatory status
Not Regulated
Balancing authority
TVA
NERC region
ReliabilityFirst (RFC)
EIA plant ID
60222

Common questions

How big is Bristol Plant?
5.4 MW across 18 units, none of which is in service — all retired.
Who owns and operates it?
Operated by Ingenco Renewable Development, LLC, filed as independent power producer.
Which grid does it sell into?
TVA (Tennessee Valley Authority) is its balancing authority, inside NERC's ReliabilityFirst region.
When is it due to retire?
It has already retired — the last unit retired in 2024.
What does it burn, and where does the fuel come from?
In 2023 it burned landfill gas and oil & petroleum.

Also at this site

Bristol Integrated Solid Waste Management FacilitySame site→

Related pages

Virginia energyAll facilities in the state→Bridleton SolarPower facility→ Bristol Integrated Solid Waste Management FacilityIndustrial facility→ C4GTPower facility→ Cabin Point Solar CenterPower facility→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming