AMERICAN ENERGY ATLAS
Power·New Jersey

Bristol Myers Squibb Lawrenceville

Mercer County, New Jersey · PJM · operated by Bristol-Myers Squibb Co

2023 · headline year
Capacity in service9.9MW2 units · gas · 1 more on standby or out of service
Net generation43.9GWh2023 · reported
Rank in New Jersey#65of 407 · by capacity · #5,592 (tied) of 13,147 US
Reported suppliersNot reported2023

Location

Mercer County · PJM · RFC

What it burns

2023 · reported

Share of reported fuel consumption

100% Natural gas · 487,280 MMBtu · reported

Reported fuel consumption, MMBtu · 2013–2023

0250,000500,000750,000201320182023
Reported (through 2023)

Generating units

3 of 3 shown · 9.9 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit TG1025.6Natural GasNatural Gas Fired Combustion Turbine2021Operating
Unit TG1014.3Natural GasNatural Gas Fired Combustion Turbine1995Operating
Unit DG1011.2Distillate oilPetroleum Liquids1991Standby

All 3 units shown. Behind each one, AEA holds the full engineering record: co-firing fuels and fuel-switching times.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
Bristol-Myers Squibb Co
Entity type
Industrial
Regulatory status
Not Regulated
Balancing authority
PJM
NERC region
ReliabilityFirst (RFC)
Gas pipeline
Public Service Electric & Gas Co
EIA plant ID
58947

Common questions

How big is Bristol Myers Squibb Lawrenceville?
9.9 MW across 2 generating units in service. A further 1 unit is listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Operated by Bristol-Myers Squibb Co, filed as industrial.
Which grid does it sell into?
PJM (PJM Interconnection, LLC) is its balancing authority, inside NERC's ReliabilityFirst region.
How old is it?
The capacity-weighted average megawatt here came online in 2010. The oldest operating unit is Unit TG101 (1995); the newest is Unit TG102 (2021).
When is it due to retire?
No retirement date has been filed for any operating unit at Bristol Myers Squibb Lawrenceville. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas.

Related pages

New Jersey energyAll facilities in the state→New Road Solar, LLC10.0 MW operating capacity→ NJ Oak Solar Plant10.0 MW operating capacity→ Berry Plastics Solar9.8 MW operating capacity→ Cinnamon Bay Edgeboro Landfill9.6 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming