AMERICAN ENERGY ATLAS
Industrial + power·Michigan

Brent Run Landfill

Montrose, Genesee County, Michigan · MISO · operated by Energy Developments, Inc d/b/a EDL · owned by GFL Environmental Holdings (US) Inc

2023 · headline year
Fuel spend$2,3602023 · estimate
Capacity in service7.0MW5 units · biomass
Net generation43.4GWh2023 · reported
CO₂ emitted58,699t2023 · reported to EPA · 3,397th highest of 6,030 in the US
Rank in Michigan#163of 258 · by capacity · #6,147 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor71%2023

Location

Genesee County · MISO · RFC

What its on-site power plant burns

2023 · reported

Share of reported fuel consumption

100% Landfill gas · 502,940 MMBtu · reported

CO₂ emitted, t · 2011–2023

0200,000400,000600,000201120172023
Reported (through 2023)

Generating units

5 of 5 shown · 7.0 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 7-11.6Landfill gasLandfill Gas1998Operating
Unit 7-21.6Landfill gasLandfill Gas1998Operating
Unit 7-41.6Landfill gasLandfill Gas2012Operating
Unit 7-51.6Landfill gasLandfill Gas2012Operating
Unit 7-30.6Landfill gasLandfill Gas2010Operating

All 5 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
Energy Developments, Inc d/b/a EDL
Entity type
Independent Power Producer
Regulatory status
Not Regulated
Industry sector
Waste
EPA facility ID
1002489
Balancing authority
MISO
NERC region
ReliabilityFirst (RFC)
EIA plant ID
54910

Common questions

How big is Brent Run Landfill?
7.0 MW across 5 generating units in service.
Who owns and operates it?
Owned by GFL Environmental Holdings (US) Inc (100%) and operated by Energy Developments, Inc d/b/a EDL, filed as independent power producer.
Which grid does it sell into?
MISO (Midcontinent Independent Transmission System Operator, Inc.) is its balancing authority, inside NERC's ReliabilityFirst region.
How old is it?
The capacity-weighted average megawatt here came online in 2005. The oldest operating units are Unit 7-1 and Unit 7-2 (1998); the newest are Unit 7-4 and Unit 7-5 (2012).
When is it due to retire?
No retirement date has been filed for any operating unit at Brent Run Landfill. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 its on-site power plant burned landfill gas.
How much does it spend on fuel?
An estimated $2,360 in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
58,699 t in 2023, reported to the EPA — the 3,397th highest of 6,030 US facilities that reported. Down from 292,353 t in 2011.

Related pages

Michigan energyAll facilities in the state→Grand Blanc Generating Station7.2 MW operating capacity→ Kingsford7.2 MW operating capacity→ Pickford Solar6.9 MW operating capacity→ Rogers6.8 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming