Power·Georgia
Brenneman Solar Project
Macon County, Georgia · SEPA · operated by Brenneman Solar LLC
Capacity shown is planned or not in service
Proposed
A planned 150 MW solar photovoltaic project, filed to come online in 2026.
Planned capacity150MW1 unit · not yet in service
Location
Generating units
1 of 1 shown · none in service
1 unit shown. Behind it, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.
See the engineering record →
Ownership & operations
- Operating utility
- Brenneman Solar LLC
- Entity type
- Independent Power Producer
- Regulatory status
- Not Regulated
- Balancing authority
- SEPA
- NERC region
- SERC
- EIA plant ID
- 66744
Common questions
How big is Brenneman Solar Project?
150 MW across 1 unit, none of which is in service — all planned.
Who owns and operates it?
Operated by Brenneman Solar LLC, filed as independent power producer.
Which grid does it sell into?
SEPA (Southeastern Power Administration) is its balancing authority, inside NERC's SERC region.
What does it run on?
Solar Photovoltaic (150 MW).
Related pages
Select a state