AMERICAN ENERGY ATLAS
Power·Texas

Braes Bayou Plant

Fort Bend County, Texas · ERCOT · operated by ProEnergy Services

2023 · headline year
Fuel spend$8.17M2023 · estimate
Capacity in service484MW8 units · gas
Net generation292GWh2023 · reported
Rank in Texas#96 (tied)of 941 · by capacity · #725 (tied) of 13,147 US
Reported suppliers12023 · 12 deliveries
Capacity factor7%2023

Location

Fort Bend County · ERCOT · TRE

What it burns

2023 · reported

Share of reported fuel consumption

100% Natural gas · 3.03 TBtu · reported · $8.17M est.

Reported fuel consumption, TBtu · 2022–23

024620222023
Reported (through 2023)

Generating units

8 of 8 shown · 484 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit CTG-160.5Natural GasNatural Gas Fired Combustion Turbine2022Operating
Unit CTG-260.5Natural GasNatural Gas Fired Combustion Turbine2022Operating
Unit CTG-360.5Natural GasNatural Gas Fired Combustion Turbine2022Operating
Unit CTG-460.5Natural GasNatural Gas Fired Combustion Turbine2022Operating
Unit CTG-560.5Natural GasNatural Gas Fired Combustion Turbine2022Operating
Unit CTG-660.5Natural GasNatural Gas Fired Combustion Turbine2022Operating
Unit CTG-760.5Natural GasNatural Gas Fired Combustion Turbine2022Operating
Unit CTG-860.5Natural GasNatural Gas Fired Combustion Turbine2022Operating

All 8 units shown. Behind each one, AEA holds the full engineering record: ownership stakes where a unit is jointly held.

See the engineering record →

Who supplies the fuel

1 of 1 supplier · delivered in 2023
SupplierFuelDelivered TBtuTonsMine of originTransport
Kinder MorganNatural gas3.03n/an/aPipeline

Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only.

The supplier is shown. Subscribe to see every one of the 19 deliveries recorded 2022–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.

See the delivery history →

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
ProEnergy Services
Entity type
Independent Power Producer
Regulatory status
Not Regulated
Balancing authority
ERCOT
NERC region
Texas RE (TRE)
Gas pipeline
Kinder Morgan Tejas Pipeline LLC
EIA plant ID
64383

Common questions

How big is Braes Bayou Plant?
484 MW across 8 generating units in service.
Who owns and operates it?
Operated by ProEnergy Services, filed as independent power producer.
Which grid does it sell into?
ERCOT (Electric Reliability Council of Texas, Inc.) is its balancing authority, inside NERC's Texas RE region.
How old is it?
The capacity-weighted average megawatt here came online in 2022. Every operating unit came online in 2022.
When is it due to retire?
No retirement date has been filed for any operating unit at Braes Bayou Plant. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas. Natural gas came from 1 supplier in 2023.
How much does it spend on fuel?
An estimated $8.17M in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.

Related pages

Texas energyAll facilities in the state→Brotman Power Station484 MW operating capacity→ Mark One Generating, LLC484 MW operating capacity→ Remy Jade Power Station484 MW operating capacity→ Parliament Solar480 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming