AMERICAN ENERGY ATLAS
Power·Pennsylvania

Bradford Solar PA

Bradford County, Pennsylvania · PJM · operated by Vesper Energy Development LLC

Capacity shown is planned or not in service

Proposed

A planned 100 MW solar photovoltaic project, filed to come online in 2026.

Planned capacity100MW1 unit · not yet in service

Location

Bradford County · PJM · RFC

Generating units

1 of 1 shown · none in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit BRDFS100.5SolarSolar Photovoltaic2026Proposed

1 unit shown. Behind it, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.

See the engineering record →
UnitEventWhenMW
Unit BRDFSnew unit2026100 MW

Ownership & operations

Operating utility
Vesper Energy Development LLC
Entity type
Independent Power Producer
Regulatory status
Not Regulated
Balancing authority
PJM
NERC region
ReliabilityFirst (RFC)
EIA plant ID
68014

Common questions

How big is Bradford Solar PA?
100 MW across 1 unit, none of which is in service — all planned.
Who owns and operates it?
Operated by Vesper Energy Development LLC, filed as independent power producer.
Which grid does it sell into?
PJM (PJM Interconnection, LLC) is its balancing authority, inside NERC's ReliabilityFirst region.
What does it run on?
Solar Photovoltaic (100 MW).

Related pages

Pennsylvania energyAll facilities in the state→Bethlehem Renewable Energy LLCPower facility→ Braddock Lock and DamPower facility→ Broad Mountain Wind ProjectPower facility→ Bruce MansfieldPower facility→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming