Clark County, Nevada · NEVP · operated by 174 Power Global Corp.
Capacity shown is planned or not in service
A planned 256 MW solar photovoltaic project, filed to come online in 2025.
| Unit | Capacity MW | Fuel | Technology | Online | Status |
|---|---|---|---|---|---|
| Unit BS301 | 127.9 | Solar | Solar Photovoltaic | 2025 | Proposed |
| Unit BS3ES | 127.9 | Storage | Batteries | 2025 | Proposed |
All 2 units shown. Behind each one, AEA holds the full engineering record: ownership stakes where a unit is jointly held.
See the engineering record →| Unit | Event | When | MW |
|---|---|---|---|
| Unit BS301 | new unit | 2025 | 128 MW |
| Unit BS3ES | new unit | 2025 | 128 MW |