AMERICAN ENERGY ATLAS
Power·Indiana

Bos Dairy, LLC

Jasper County, Indiana · MISO · operated by Bos Dairy, LLC

2023 · headline year
Fuel spend$413,0172023 · estimate
Capacity in service1.0MW1 unit · gas
Net generation6.83GWh2023 · reported
Rank in Indiana#194 (tied)of 202 · by capacity · #12,215 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor78%2023

Location

Jasper County · MISO · RFC

What it burns

2023 · reported

Share of reported fuel consumption

100% Natural gas · 63,639 MMBtu · reported · $413,017 est.

Reported fuel consumption, MMBtu · 2011–2023

050,000100,000150,000201120172023
Reported (through 2023)

Generating units

5 of 5 shown · 1.0 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit BOS41.0Natural GasNatural Gas Internal Combustion Engine2020Operating
Unit BOS51.0Natural GasNatural Gas Internal Combustion Engine2026Planned
Unit BOS20.7Natural GasNatural Gas Internal Combustion Engine2011Retired 2020
Unit BOS10.4BiogasOther Waste Biomass2005Retired 2015
Unit BOS30.4Natural GasNatural Gas Internal Combustion Engine2011Retired 2020

All 5 units shown. Behind each one, AEA holds the full engineering record: ownership stakes where a unit is jointly held.

See the engineering record →
UnitEventWhenMW
Unit BOS5new unit20261.0 MW

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
Bos Dairy, LLC
Entity type
Commercial
Regulatory status
Not Regulated
Balancing authority
MISO
NERC region
ReliabilityFirst (RFC)
EIA plant ID
57625

Common questions

How big is Bos Dairy, LLC?
1.0 MW across 1 generating unit in service. A further 4 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Operated by Bos Dairy, LLC, filed as commercial.
Which grid does it sell into?
MISO (Midcontinent Independent Transmission System Operator, Inc.) is its balancing authority, inside NERC's ReliabilityFirst region.
How old is it?
The capacity-weighted average megawatt here came online in 2020.
When is it due to retire?
No retirement date has been filed for any operating unit at Bos Dairy, LLC. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas.
How much does it spend on fuel?
An estimated $413,017 in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.

Related pages

Indiana energyAll facilities in the state→Spring Mill Solar RES1.1 MW operating capacity→ Walkerton1.1 MW operating capacity→ Hidden View Dairy, LLC1.0 MW operating capacity→ Hobart Solar, LLC1.0 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming