AMERICAN ENERGY ATLAS
Power·Ohio

Border Basin Solar

Hancock County, Ohio · PJM · operated by Border Basin, LLC

Capacity shown is planned or not in service

Proposed

A planned 120 MW solar photovoltaic project, filed to come online in 2025.

Planned capacity120MW1 unit · not yet in service

Location

Hancock County · PJM · RFC

Generating units

1 of 1 shown · none in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit ENX37120.0SolarSolar Photovoltaic2025Proposed

1 unit shown. Behind it, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.

See the engineering record →
UnitEventWhenMW
Unit ENX37new unit2025120 MW

Ownership & operations

Operating utility
Border Basin, LLC
Entity type
Independent Power Producer
Regulatory status
Not Regulated
Balancing authority
PJM
NERC region
ReliabilityFirst (RFC)
EIA plant ID
68968

Common questions

How big is Border Basin Solar?
120 MW across 1 unit, none of which is in service — all planned.
Who owns and operates it?
Operated by Border Basin, LLC, filed as independent power producer.
Which grid does it sell into?
PJM (PJM Interconnection, LLC) is its balancing authority, inside NERC's ReliabilityFirst region.
What does it run on?
Solar Photovoltaic (120 MW).

Related pages

Ohio energyAll facilities in the state→Birch SolarPower facility→ Black Fork Wind Energy ProjectPower facility→ Bowling GreenPower facility→ Bridgewater Dairy Anaerobic DigesterPower facility→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming