Boise Cascade International Falls

Koochiching County, Minnesota · MISO · operated by Boise White Paper LLC

2023 · headline year
Capacity in service52.3MW1 unit · biomass
Net generation321GWh2023 · reported
Rank in Minnesota#58of 767 · by capacity · #3,396 of 13,147 US
Reported suppliersNot reported2023
Capacity factor70%2023

Location

Koochiching County · MISO · MRO

What it burns

2023 · reported

Share of reported fuel consumption

79% Black liquor · 7.63 TBtu · reported21% Natural gas · 1.98 TBtu · reported

Black liquor supplies 79% of the fuel energy it burned in 2023.

Reported fuel consumption, TBtu · 2011–2023

051015201120172023
Reported (through 2023)

Generating units

6 of 6 shown · 52.3 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit GEN 652.3Black liquorWood/Wood Waste Biomass2015Operating
Unit GEN37.5Black liquorWood/Wood Waste Biomass1948Retired 2015
Unit GEN47.5Black liquorWood/Wood Waste Biomass1947Retired 2015
Unit GEN56.2Black liquorWood/Wood Waste Biomass1957Retired 2018
Unit GEN14.0Black liquorWood/Wood Waste Biomass1927Retired 2015
Unit GEN24.0Black liquorWood/Wood Waste Biomass1927Retired 2015

All 6 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; co-firing fuels and fuel-switching times; NOₓ, particulate and mercury controls with compliance years.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
Boise White Paper LLC
Entity type
Industrial
Regulatory status
Not Regulated
Balancing authority
MISO
NERC region
MRO
Gas pipeline
Centra Pipelines Minnesota Inc
EIA plant ID
10486

Common questions

How big is Boise Cascade International Falls?
52.3 MW across 1 generating unit in service. A further 5 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Operated by Boise White Paper LLC, filed as industrial.
Which grid does it sell into?
MISO (Midcontinent Independent Transmission System Operator, Inc.) is its balancing authority, inside NERC's MRO region.
How old is it?
The capacity-weighted average megawatt here came online in 2015.
When is it due to retire?
No retirement date has been filed for any operating unit at Boise Cascade International Falls. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned black liquor and natural gas.

Related pages

Minnesota energyAll facilities in the state→Marshall Solar Energy Project62.3 MW operating capacity→ St Bonifacius61.2 MW operating capacity→ Lakeswind Power Partners51.8 MW operating capacity→ Moraine Wind LLC51.0 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming