AMERICAN ENERGY ATLAS
Power·California

Blythe Solar III, LLC Hybrid

Riverside County, California · CAISO · operated by Blythe Solar III, LLC

2023 · headline year
Fuel spend$02023 · no purchased fuel
Capacity in service252MW2 units · solar + storage
Rank in California#92of 1,713 · by capacity · #1,163 (tied) of 13,147 US

Location

Riverside County · CAISO · WECC

Generating units

2 of 2 shown · 252 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit BLSL3136.8SolarSolar Photovoltaic2020Operating
Unit BLST3115.0StorageBatteries2021Operating

All 2 units shown. Behind each one, AEA holds the full engineering record: panel technology, tracking and DC capacity; energy capacity in MWh, charge and discharge rates and use cases.

See the engineering record →

Ownership & operations

Operating utility
Blythe Solar III, LLC
Entity type
Independent Power Producer
Regulatory status
Not Regulated
Balancing authority
CAISO
NERC region
WECC
EIA plant ID
60094

Common questions

How big is Blythe Solar III, LLC Hybrid?
252 MW across 2 generating units in service — 137 MW of solar and 115 MW of storage.
Who owns and operates it?
Operated by Blythe Solar III, LLC, filed as independent power producer.
Which grid does it sell into?
CAISO (California Independent System Operator) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 2020. The oldest operating unit is Unit BLSL3 (2020); the newest is Unit BLST3 (2021).
When is it due to retire?
No retirement date has been filed for any operating unit at Blythe Solar III, LLC Hybrid. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it run on?
Solar Photovoltaic (137 MW) and Batteries (115 MW).
How much does it spend on fuel?
Nothing in 2023 — its units in service (batteries and solar photovoltaic) burn no fuel, and it reports no fuel consumption to the EIA.

Related pages

California energyAll facilities in the state→Mount Signal Solar Farm V252 MW operating capacity→ Long Beach Generating Station252 MW operating capacity→ Aquamarine250 MW operating capacity→ Athos Solar Project250 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming