Pecos County, Texas · ERCOT · operated by Greenalia Wind Power Blackwelder Ranch, LLC
Capacity shown is planned or not in service
A planned 110 MW onshore wind turbine project, filed to come online in 2030.
| Unit | Capacity MW | Fuel | Technology | Online | Status |
|---|---|---|---|---|---|
| Unit BRGWP | 110.4 | Wind | Onshore Wind Turbine | 2030 | Proposed |
1 unit shown. Behind it, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.
See the engineering record →| Unit | Event | When | MW |
|---|---|---|---|
| Unit BRGWP | new unit | 2030 | 110 MW |