AMERICAN ENERGY ATLAS
Power·Indiana

BioTown Ag

White County, Indiana · MISO · operated by Bio Town Biogas, LLC

2023 · headline year
Capacity in service6.0MW6 units · biomass
Net generation30.2GWh2023 · reported
Rank in Indiana#114of 202 · by capacity · #6,337 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor57%2023

Location

White County · MISO · RFC

What it burns

2023 · reported

Share of reported fuel consumption

100% Landfill gas · 377,008 MMBtu · reported

Reported fuel consumption, MMBtu · 2014–23

0200,000400,000600,000201420182023
Reported (through 2023)

Generating units

6 of 6 shown · 6.0 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit ENG11.0BiogasOther Waste Biomass2011Operating
Unit ENG21.0BiogasOther Waste Biomass2011Operating
Unit ENG31.0BiogasOther Waste Biomass2011Operating
Unit ENG41.0BiogasOther Waste Biomass2014Operating
Unit ENG51.0BiogasOther Waste Biomass2014Operating
Unit ENG61.0BiogasOther Waste Biomass2014Operating

All 6 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
Bio Town Biogas, LLC
Entity type
Industrial
Regulatory status
Not Regulated
Balancing authority
MISO
NERC region
ReliabilityFirst (RFC)
EIA plant ID
59774

Common questions

How big is BioTown Ag?
6.0 MW across 6 generating units in service.
Who owns and operates it?
Operated by Bio Town Biogas, LLC, filed as industrial.
Which grid does it sell into?
MISO (Midcontinent Independent Transmission System Operator, Inc.) is its balancing authority, inside NERC's ReliabilityFirst region.
How old is it?
The capacity-weighted average megawatt here came online in 2013. The oldest operating units are Unit ENG1, Unit ENG2 and Unit ENG3 (2011); the newest are Unit ENG4, Unit ENG5 and Unit ENG6 (2014).
When is it due to retire?
No retirement date has been filed for any operating unit at BioTown Ag. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned landfill gas.

Related pages

Indiana energyAll facilities in the state→POET Biorefining - Shelbyville6.1 MW operating capacity→ IMPA Richmond 8 Solar Park6.1 MW operating capacity→ Kokomo Solar 1, LLC5.4 MW operating capacity→ Linton5.4 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming