AMERICAN ENERGY ATLAS
Power·Oregon

Biomass One LP

Jackson County, Oregon · PACW · operated by Biomass One LP

2023 · headline year
Capacity in service30.0MW2 units · biomass · 1 more on standby or out of service
Net generation136GWh2023 · reported
Rank in Oregon#61 (tied)of 278 · by capacity · #4,011 (tied) of 13,147 US
Reported suppliersNot reported2023

Location

Jackson County · PACW · WECC

What it burns

2023 · reported

Share of reported fuel consumption

100% Biomass · 2.46 TBtu · reported

Reported fuel consumption, TBtu · 2011–2023

0246201120172023
Reported (through 2023)

Generating units

3 of 3 shown · 30.0 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit GE15.0WoodWood/Wood Waste Biomass1985Operating
Unit GE-215.0WoodWood/Wood Waste Biomass2009Operating
Unit BBC10.0WoodWood/Wood Waste Biomass1985Standby

All 3 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
Biomass One LP
Entity type
Independent Power Producer
Regulatory status
Not Regulated
Balancing authority
PACW
NERC region
WECC
EIA plant ID
10869

Common questions

How big is Biomass One LP?
30.0 MW across 2 generating units in service. A further 1 unit is listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Operated by Biomass One LP, filed as independent power producer.
Which grid does it sell into?
PACW (PacifiCorp - West) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 1997. The oldest operating unit is Unit GE (1985); the newest is Unit GE-2 (2009).
When is it due to retire?
No retirement date has been filed for any operating unit at Biomass One LP. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned biomass.

Related pages

Oregon energyAll facilities in the state→Prospect 232.0 MW operating capacity→ Wauna Mill30.0 MW operating capacity→ Hills Creek30.0 MW operating capacity→ Clearwater 226.0 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming