AMERICAN ENERGY ATLAS
Power·California

Biola University Hybrid

Los Angeles County, California · CAISO · operated by Biola University

2023 · headline year
Fuel spend$1.51M2023 · estimate
Capacity in service4.3MW4 units · gas + storage
Rank in California#966 (tied)of 1,713 · by capacity · #7,945 (tied) of 13,147 US
Reported suppliersNot reported2023

Location

Los Angeles County · CAISO · WECC

What it burns

2023 · reported

Share of reported fuel consumption

100% Natural gas · 111,103 MMBtu · reported · $1.51M est.

Reported fuel consumption, MMBtu · 2011–2023

0100,000200,000300,000201120172023
Reported (through 2023)

Generating units

6 of 6 shown · 4.3 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit EG-1H1.5Natural GasNatural Gas Internal Combustion Engine2023Operating
Unit EG-2H1.5Natural GasNatural Gas Internal Combustion Engine2022Operating
Unit EG31.0Natural GasNatural Gas Internal Combustion Engine2002Operating
Unit BATT0.3StorageBatteries2018Operating
Unit EG10.6Natural GasNatural Gas Internal Combustion Engine1990Retired 2020
Unit EG20.6Natural GasNatural Gas Internal Combustion Engine1990Retired 2020

All 6 units shown. Behind each one, AEA holds the full engineering record: energy capacity in MWh, charge and discharge rates and use cases.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
Biola University
Entity type
Commercial
Regulatory status
Not Regulated
Balancing authority
CAISO
NERC region
WECC
Gas pipeline
Transwestern Pipeline Company, El Paso Natural Gas Company LLC
EIA plant ID
54296

Common questions

How big is Biola University Hybrid?
4.3 MW across 4 generating units in service — 4.0 MW of natural gas and 0.3 MW of storage. A further 2 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Operated by Biola University, filed as commercial.
Which grid does it sell into?
CAISO (California Independent System Operator) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 2017. The oldest operating unit is Unit EG3 (2002); the newest is Unit EG-1H (2023).
When is it due to retire?
No retirement date has been filed for any operating unit at Biola University Hybrid. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas.
How much does it spend on fuel?
An estimated $1.51M in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.

Related pages

California energyAll facilities in the state→Upper Dawson4.4 MW operating capacity→ VA Sepulveda Ambulatory Care Center4.4 MW operating capacity→ Igs KSBD4.3 MW operating capacity→ Pacific Ethanol Madera Solar Array4.3 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming